The PM PrepCast lessons are based on the PMBOK Guide Sixth Edition FIRST Printing, which includes this item as an input. In later printings, PMI removed this particular item.
Please refer to the Errata sheet where PMI includes all the small and large changes that were applied:
Hi guys. The training I did listed "Source Selection Criteria" as part of the Project Documents that serve as inputs to the "Manage Project Knowledge" process. However, I do not see this listed as an ITTO in the PMBOK (Refer 4.4.1.2 page 101). Is this a mistake in my training documentation or am I missing something? Thanks.