I have read the PMBOK Guide 6 and do not understand the difference between many of the Output documents.
1) Why would you create a Resource Requirements doc and a Resource Breakdown Structure? Doesn't the Resource Breakdown Structure contain all the info in the Resource Requirements?

2)How is the info in the Physical Resource Assignments doc different from the physical resources that are listed in the Resource Requirements doc?