Thank you for letting us know about this error. We have looked into it and confirmed that there was indeed an issue with the text on the slide in L04.04: Agile Adapting Concepts.
We have noted it in our errata sheet, which is in Appendix A of the Agile PrepCast.
L04.04: Agile Adapting Concepts, slide titled Agile Cost Targeted Contract, I think the third bullet point should be "If over budget..." not under (which is same as second bullet).